HYDEC Engineering Sdn. Bhd.

PROJECT EXPERIENCE PROFILE


PROJECT TITLE :
Hydraulic Study for Lok Kawi Land Reclamation, Sabah, Malaysia
CLIENT :
Sunduvon Corporation Sdn. Bhd.
DURATION :
August 1992 - February 1993
PROJECT DESCRIPTION
MIKE21 modelling carried out to find the optimum layout for reclamation of about 220 hectares of land about 20 km southwest of Kota Kinabalu, state capital of Sabah. The best layout being that which causes the least impact to the hydraulic regime around the site. The assessment of erosion and sedimentation patterns before and after reclamation was studied along with the selection of the platform level and the most suitable form of coastal protection.

PROJECT TITLE :
Agricultural Drainage Scheme, Mukim Jeram Batu, Pontian, Johore, Malaysia
CLIENT :
Department of Irrigation & Drainage, Johore, Malaysia
DURATION :
September 1992 - May 1993
PROJECT DESCRIPTION
The design of tidal control gates, creek closures, levee, collector drains, internal secondary drains, farm roads, bridges and gate-keeper quarters for flood protection of agricultural land. The application of MIKE11 for testing various design alternatives, especially for unsteady tidal control gate hydraulics.

PROJECT TITLE :
Hydraulic Study for Tg. Tokong Land Reclamation, Penang, Malaysia
CLIENT :
Pengurusan Lebuhraya Bhd.
DURATION :
October 1992 - February 1993
PROJECT DESCRIPTION
The use of MIKE21 modelling software to determine the best reclamation layout (between conventional and island systems of reclamation) which includes the provision of a breakwater system for about 980 acres of land on the northeastern part of Penang. Movement of suspended particles within the vicinity of the project area was also modelled.

PROJECT TITLE :
Environmental Impact Assessment (EIA) & Design for Perlis Land Reclamation, Perlis, Malaysia
CLIENT :
Perlis Land Sdn. Bhd.
DURATION :
October 1992 - December 1992
PROJECT DESCRIPTION
The preparation of an EIA report for the proposed 500 acres reclamation within the Straits of Malacca near Kuala Perlis which included hydraulic modelling. The design of the offshore land reclamation which includes fill material, soil improvement, coastal protection, drainage and soil investigation was also carried out.

PROJECT TITLE :
Feasibility Study for Reclamation Works at the Federal Territory of Labuan, Malaysia
CLIENT :
Public Works Department (JKR), Malaysia
DURATION :
January 1993 - September 1993
PROJECT DESCRIPTION
The preparation of an EIA report and a hydraulic study for the proposed reclamation of about 7000 acres of land on the eastern and southern coasts of Labuan Island, the only International Offshore Financial Centre in Malaysia. The hydraulic report detailed a geotechnical assessment, flood mitigation (using MIKE11), hydraulic modelling for optimum reclamation layout and nearshore sediment transport utilising the MIKE21 and LITPACK modelling software. The preliminary design of coastal protection works for the reclamation was also made.

PROJECT TITLE :
Local Plan Studies for Padang Matsirat & Padang Lalang, Langkawi, Kedah, Malaysia
CLIENT :
Town & Country Planning Department (JPBD) - Northern Branch, Malaysia
DURATION :
January 1993 - August 1993
PROJECT DESCRIPTION
The assessment of the existing water supply and drainage conditions and the recommendation of guidelines for future development of both areas in Malaysia's premier tourist island destination. Among the issues discussed, was the shortage of water and limited reserves available for drainage channels.

PROJECT TITLE :
Hydraulic Study for the Straits of Johore, Malaysian- Singapore Border
CLIENT :
Johore Coastal Development Sdn. Bhd.
DURATION :
February 1993 - March 1993
PROJECT DESCRIPTION
The use of MIKE21 to study the current pattern, sediment movement and erosion/accretion before and after the land reclamation on the western part of the Malaysian side of the causeway at Johor Bahru, state capital of Johore.

PROJECT TITLE :
Hydraulic Study for the Lumut Maritime Terminal, Perak, Malaysia
CLIENT :
PCO Constructors Sdn. Bhd.
DURATION :
April 1993 - June 1993
PROJECT DESCRIPTION
Utilisation of MIKE21 to evaluate the possible impacts of the proposed dredging activities during the construction of the marine terminal at Sg. Dinding and to optimise dredging operations to minimize impact to the surrounding areas.

PROJECT TITLE :
Hydraulics & Coastal Engineering Study for Labuan Marina Centre, Federal Territory of Labuan, Malaysia
CLIENT :
Waterfront Group
DURATION :
May 1993 - June 1993
PROJECT DESCRIPTION
A hydraulic study conducted to determine the environmental impact of the land reclamation cum marina development (on the southern coast of Labuan) on the surrounding coastal environment and to advise the client on the conceptual design of coastal protection work necessary for the marina.

PROJECT TITLE :
Structural Plan Studies for Kuala Langat & Part of Sepang District, Selangor, Malaysia
CLIENT :
Town & Country Planning Department (JPBD), Malaysia
DURATION :
May 1993 - August 1993
PROJECT DESCRIPTION
The assessment of the existing state of coastal erosion and the appraisal of the anticipated impacts on the coastal areas due to a proposed development plan as the area is located close to the new Kuala Lumpur International Airport in Sepang. Recommendations and guidelines on development within the coastal zone were also made.

PROJECT TITLE :
esign & Supervision for the Construction & Completion of the Proposed Offshore Beacons for the Submerged Breakwater's Marker off Rantau Petronas, Kerteh, Terengganu, Malaysia
CLIENT :
PETRONAS
DURATION :
July 1993 - September 1993
PROJECT DESCRIPTION
Design, preparation of contract documents and supervision during construction of the offshore beacons placed to warn marine vessels of the presence of submerged breakwaters which were built to protect the shoreline where a petroleum complex is located.

PROJECT TITLE :
Hydraulic Study for the Proposed Waterfront Mixed Development on Lot 650, Block 10, at Upper Lanang Road, Sibu, Sarawak, Malaysia
CLIENT :
Rimbunan Hijau Sdn. Bhd.
DURATION :
July 1993 - August 1993
PROJECT DESCRIPTION
A study on current pattern and sedimentation, before, during and after reclamation, conducted to determine the effects of land reclamation as part of a mixed development on the banks of the Rajang River.

PROJECT TITLE :
Flood Alleviation Study at km10 of the New Klang Valley Expressway (NKVE), Selangor, Malaysia
CLIENT :
Projek Lebuhraya Utara Selatan (PLUS) Bhd.
DURATION :
August 1993 - April 1994
PROJECT DESCRIPTION
An investigation into the causes of flood occurrence on this stretch of highway which has become an important link between Kuala Lumpur and Shah Alam. Mitigation measures were proposed and supervised by the consultant eg. the excavation of the Damansara River channel flowing under one of the highway's bridges just upstream of the affected area.

PROJECT TITLE :
Perak-Selangor Water Supply Privatisation Project Feasibility Study, Malaysia
CLIENT :
Renong Berhad
DURATION :
August 1993 - September 1993
PROJECT DESCRIPTION
A study was made of the commercial viability of initiating a water supply privatisation package that takes into account the immediate and future needs of both the states of Selangor and Perak.

PROJECT TITLE :
Numerical Modelling for the Sg. Sarawak Regulation Scheme, Sarawak, Malaysia
CLIENT :
PPES Road Construction Sdn. Bhd. & the Sarawak State Government
DURATION :
August 1993 - December 1993
PROJECT DESCRIPTION
It was envisioned by the state government that a barrage be constructed to regulate the flow of the Sarawak River at all times. The study was divided into several stages to achieve adequate modelling of the hydraulics, sediment transport and water quality in the Sarawak River. MIKE11 was used to assist in the detailed design, flood forecasting and environmental assessment of the river system and regulation scheme. MIKE21 was utilised to provide the current pattern for different scenarios to aid navigation simulations conducted by the client.

PROJECT TITLE :
Hydraulic Study for the Proposed Sutera Harbour Land Reclamation, Sabah, Malaysia
CLIENT :
Pembinaan OCK (M) Sdn. Bhd.
DURATION :
September 1993 - November 1993
PROJECT DESCRIPTION
A hydraulic study was initiated to investigate current patterns, sediment movement and wave refraction activity before and after the implementation of the proposed reclamation facing the South China Sea. The reclamation which is about 380 acres, a resort, residential and marina development is situated approximately 2.5 km from the main port of Kota Kinabalu.

PROJECT TITLE :
Hydraulic Study for Sand Mining at Ramunia Shoals, Offshore Johore, Malaysia
CLIENT :
Alur Jaya Sdn. Bhd. & Obayashi-Toyo Joint Venture
DURATION :
September 1993 - November 1993
PROJECT DESCRIPTION
A company obtained a concession to extract high quality sand about 50 km offshore from Johore's eastern coast. MIKE21 was used to predict variation in current pattern, sediment movement and wave activity at the shoreline due to the sand mining activity.

PROJECT TITLE :
Consultancy Services for the Water Supply Works at Southbound Nilai Layby, Negeri Sembilan, Malaysia
CLIENT :
Project Lebuhraya Utara-Selatan (PLUS) Bhd.
DURATION :
August 1993 - October 1995
PROJECT DESCRIPTION
Studied the demand and existing water supply to ascertain the cause(s) of shortage during peak hours at the layby. Design and implemetation of remedial measures such as piped Department of Water Supply (JBA), pumps and water tanks were executed.

PROJECT TITLE :
Drainage Master Plan Study for Batu Pahat, Johore, Malaysia
CLIENT :
Department of Irrigation & Drainage , Malaysia
DURATION :
October 1993 - Present
PROJECT DESCRIPTION
Assessment of the existing hydrologic and hydraulic conditions in Batu Pahat. The application of RAFTS-XP and MIKE11 in the formulation of the conceptual and preliminary designs to improve the town's drainage system.

PROJECT TITLE :
Hydraulic Study for the Malaysian- Singapore Second Bridge, Malaysian- Singapore Border
CLIENT :
Lintasan Kedua (LINK) Sdn. Bhd.
DURATION :
October 1993 - April 1995
PROJECT DESCRIPTION
It was proposed that a bridge be built as a second road link between Malaysia and Singapore at Gelang Patah, Johore (Malaysian side). MIKE21 was used to model the current pattern and sediment movement for various scenarios which include the provision of artificial islands. The model was also used to evaluate scouring effects around the bridge piers.

PROJECT TITLE :
Leachate Dispersion Study for the Development of a Sanitary Landfill Site at Pulau Burong, Seberang Perai, Penang, Malaysia
CLIENT :
Ranhill Bersekutu Sdn. Bhd.
DURATION :
October 1993 - January 1994
PROJECT DESCRIPTION
The site is located close to the coast near to the Penang- Perak state border; an understanding of the current pattern around the site is imperative so as to determine the extent of dispersion of pollutants from the proposed landfill site to the surrounding waters.

PROJECT TITLE :
Hydraulic Study for the Proposed Development of Miri Resort City, Sarawak, Malaysia
CLIENT :
Samling Corporation Sdn. Bhd.
DURATION :
December 1993 - March 1994
PROJECT DESCRIPTION
A study into the coastal processes and sediment movement in determining the feasibility of performing a large scale land reclamation which includes the diversion of the Miri River utilising MIKE21 and LITPACK. The reclamation (which includes a marina) is part of a residential cum resort development to transform Miri town into a resort city by the next century. The proposed drainage system for the urban and coastal development is simulated via MIKE11 to assess its adequacy in catering for major storms.

PROJECT TITLE :
Hydraulic Study for Sand Mining Offshore Johore, Malaysia
CLIENT :
Golden Bake Sdn. Bhd.
DURATION :
November 1993 - December 1993
PROJECT DESCRIPTION
The client obtained a concession to mine high grade sand close to the Ramunia Shoals, offshore Johore. MIKE21 was used to determine current pattern before and after the sand mining and sediment dispersion during the sand extraction.

PROJECT TITLE :
Design & Supervision for the Integrated Shrimp Farm Project - Construction of Jetty & Flume Structure, Kerpan, Kedah, Malaysia
CLIENT :
Samak Aquaculture Sdn. Bhd.
DURATION :
1994 - Present
PROJECT DESCRIPTION
Design of a jetty and flume structure for conveyance of seawater 2 km offshore pumped at regular intervals daily to the shrimp farm inland which is located close to Alor Setar, state capital of Kedah. HYDEC also supervised the construction of the structure.

PROJECT TITLE :
Hydraulic Study for Dredging off the Coast of Johore, Malaysia
CLIENT :
Ranhill Bersekutu Sdn. Bhd. on behalf of Sime Sembawang Sdn. Bhd.
DURATION :
January 1994 - February 1994
PROJECT DESCRIPTION
As part of its expansion plans, a shipyard on the southern coast of Johore intends to deepen the waters fronting the shipyard. MIKE21 was used to determine the effects of such deepening on the surrounding area.

PROJECT TITLE :
Numerical Modelling for Coastal Protection & Land Reclamation at Brighton Beach, Miri, Sarawak, Malaysia
CLIENT :
Doyon Development Sdn. Bhd.
DURATION :
January 1994 - February 1994
PROJECT DESCRIPTION
The client intends to reclaim a small portion of land in front of an existing 4-star hotel. Thus a study of the effects of such activity on the nearshore hydraulic regime was conducted.

PROJECT TITLE :
Hydraulic Study for the Proposed Deepwater Port Development at Senari, Sarawak, Malaysia
CLIENT :
U.P. Services Sdn. Bhd.
DURATION :
February 1994 - March 1994
PROJECT DESCRIPTION
The development of a new port for Kuching, state capital of Sarawak, on the banks of the Sarawak River was studied using MIKE21 to assess the effects of the development to the riverine hydraulic regime.

PROJECT TITLE :
A Study for the Development of Marine Pollution Control Regulations, Malaysia
CLIENT :
Department of Environment, Malaysia
DURATION :
February 1994 - December 1994
PROJECT DESCRIPTION
Malaysia's coastal waters have some of the world's richest ecosystems and habitats supporting a wide diversity of marine life and providing valuable resources. The study was carried out to evaluate the present extent of marine pollution; examine existing legislation and regulations; review current and available treatment technologies; review the existing institutional framework and recommend measures and provisions for the effective control of marine pollution.

PROJECT TITLE :
Combined Cycle Power Plant Project at Lumut, Perak, Malaysia
CLIENT :
Sikap Energy Ventures Sdn. Bhd.
DURATION :
February 1994 - January 1995
PROJECT DESCRIPTION
Cooling water intake and outlet pipelines are to be installed for the power plant. For the purpose of detailing the layout of the intake and outlet works, studies were performed regarding nearshore bathymetry, hydrodynamic conditions, sea water conditions, rate of recirculation and soil conditions.

PROJECT TITLE :
Numerical Modelling Study for Pantai Kok, Langkawi Island, Malaysia
CLIENT :
Berjaya Langkawi Beach Resort Sdn. Bhd.
DURATION :
April 1994 - August 1994
PROJECT DESCRIPTION
To cater for the rising influx of tourists to Langkawi Island, the client wishes to develop a golf course and an inland marina next to its existing resort (which also includes the construction of a training wall for beach stabilisation and wave dissipation). MIKE21 was utilised to model the current pattern and sediment movement in the vicinity of Pantai Kok's nearshore area. The model was also used to model flushing effects and the movement of pollutants within the marina.

PROJECT TITLE :
Langkawi Marina Project - Hydraulic Study, Kedah, Malaysia
CLIENT :
Coastal & Offshore Engineering Institute, Universiti Teknologi Malaysia on behalf of EKRAN Berhad
DURATION :
April 1994 - June 1995
PROJECT DESCRIPTION
The client has proposed an approximately 2000 hectares' reclamation project on the west coast of Langkawi which incorporates the Langkawi airport runway extension, a golf course, resort and marina development. A hydraulic study was conducted to determine the best reclamation layout for the least disturbance to the hydraulic regime of the surrounding area.

PROJECT TITLE :
EIA for the Proposed Beach Resort on Lot 141, 142, 144 & 146 Batu Rakit, Kuala Terengganu for Sutera Beach Resort, Terengganu, Malaysia
CLIENT :
Priced Resources Sdn. Bhd.
DURATION :
April 1994 - August 1994
PROJECT DESCRIPTION
An EIA study was conducted for a 9.73 acres' seafront resort development situated about 27 km from Kuala Terengganu, state capital of Terengganu. As the resort complex was located close to the beach, the provision of a coastal protection measure was recommended.

PROJECT TITLE :
Detailed Design for Improvement of Parit Dhoby, Batu Pahat, Johore, Malayisa
CLIENT :
Department of Irrigation & Drainage, Malaysia
DURATION :
May 1994 - May 1995
PROJECT DESCRIPTION
The existing Parit Dhoby, an irrigation and drainage channel which drains into the Batu Pahat River, floods regularly due to a reduction in its conveyance and flow capacity. A design of the improvement of the drain and related structures, such as tidal gates to prevent flooding influenced by tides from the river, was executed.

PROJECT TITLE :
EIA & Hydraulic Study for the Proposed Integrated Resort Development at Tg. Rhu in Langkawi Island, Kedah, Malaysia
CLIENT :
Kauthar Venture Capital Sdn. Bhd.
DURATION :
May 1994 - September 1994
PROJECT DESCRIPTION
Tg. Rhu, with its sandy beaches and clear blue water, is situated on the northern coast of Langkawi Island. It is at this location that a resort, marina and residential development is proposed. An EIA study was conducted for this purpose. A hydraulic study was done to study the current pattern, wave activity and sediment movement within the vicinity of the project area, before, during and after development. MIKE21 was also used to study the placement of offshore breakwaters and the construction of a marina at the Rhu River estuary. A separate study was also conducted to identify the flora and fauna of the wetlands in the immediate vicinity of the project area.

PROJECT TITLE :
Hydraulic Study for the Proposed Fishing Harbour at Batu Maung, Pulau Pinang, Malaysia
CLIENT :
Jurutera Konsultan (SEM) Sdn. Bhd.
DURATION :
July 1994 - May 1996
PROJECT DESCRIPTION
As a fishing port situated on the southeastern part of Pulau Pinang, Batu Maung has over the years catered for an increasing number of fishermen and their vessels. To remedy the current congestion at the port, the government has proposed that the part of the waters within the port area be deepened and new jetties be built. A breakwater system is also proposed by the main consultant of this project to provide better shelter for the fishermen. The wave activity and current pattern around the area was modelled using MIKE21. A large scale field data collection programme was prepared by HYDEC and executed by a client appointed licenced surveyor.

PROJECT TITLE :
Sedimentation Study for a Collapsible Weir on Sg. Sarawak Kiri, Sarawak, Malaysia
CLIENT :
Syed Muhammad, Hooi & Binnie Sdn. Bhd. & the Kuching Water Board
DURATION :
August 1994 - November 1994
PROJECT DESCRIPTION
The sediment transport behaviour in the Sarawak Kiri River, in relation to the existing and post barrage conditions, was studied. This behaviour determined the impact of sedimentation on the collapsible weir proposed for water supply intake.

PROJECT TITLE :
Hydraulic Study for the Reclamation of Pulau Sekati at Kuala Terengganu, Malaysia
CLIENT :
Department of Irrigation & Drainage, Terengganu, Malaysia
DURATION :
August 1994 - June 1996
PROJECT DESCRIPTION
Pulau Sekati is an island located within the Terengganu River estuary. The construction of a link such as a bridge or causeway or total or partial reclamation of the channel between the island and the right bank of Terengganu River was proposed. A large scale field data collection programme was prepared and executed jointly between HYDEC and the client. MIKE11 was utilised to assess flooding conditions due to the various alternatives. MIKE21 was used to determine the best reclamation layout with respect to the hydraulic regime in the immediate vicinity.

PROJECT TITLE :
Hydraulic Study for Chendering Fishing Port, Terengganu, Malaysia
CLIENT :
Public Works Department (JKR), Malaysia
DURATION :
July 1994 - May 1996
PROJECT DESCRIPTION
The Chendering fishing port is important to fishermen who not only unload their catch but also moor their vessels there. Due to the siltation of many of the rivermouths in Terengganu, there has been an increasing number of fishermen using this port which is accessible all year round. To accommodate the increase, the authorities have decided to improve the port facilities. A study was conducted to analyse a new breakwater system and the effects of the existing breakwaters to the surrounding areas. The study also included the analysis of existing shoreline conditions, coastal processes and the effectiveness of the existing breakwaters. Both the MIKE21 and LITPACK modelling softwares were utilised.

PROJECT TITLE :
EIA for Bakun Hydro-Power Dam - Downstream Hydrology and Hydraulics, Sarawak, Malaysia
CLIENT :
Universiti Teknologi Malaysia on behalf of Bakun Management Sdn. Bhd.
DURATION :
August 1994 - August 1995
PROJECT DESCRIPTION
The construction of the Bakun Hydroelectric Dam was to cater for the power needs of the nation in the wake of rapid development taking place. The dam is situated upstream of the Rajang River, the longest river in Malaysia. A study of flood and drought levels, sedimentation/erosion, as well as riverine water quality was conducted using MIKE11. The occurance of dambreak was modelled, using MIKE21, to determine the extent and effects of onrushing water towards the towns located along the river. A quantitative risk analysis report was also submitted to the client.

PROJECT TITLE :
EIA for Cahaya, the Sanctuary, Shah Alam, Selangor, Malaysia
CLIENT :
U.P. Services Sdn. Bhd.
DURATION :
September 1994 - October 1994
PROJECT DESCRIPTION
An EIA study was conducted for a proposed upmarket residential project located on a hill not far from an agricultural park in Shah Alam. Of particular concern was the presence of a stream and its water quality within the project location.

PROJECT TITLE :
Hydraulic Study for Dumpil Bay Resort Development, Sabah, Malaysia
CLIENT :
Sabah Urban Development Corporation Sdn. Bhd.
DURATION :
September 1994 - July 1995
PROJECT DESCRIPTION
Modelling work using MIKE21 was carried out to study the effects of development (which includes reclamation, diversion channels and a marina) situated slightly south of Kota Kinabalu. Of particular importance was the current pattern, nearshore wave activity and sediment movement in the vicinity of the project area.

PROJECT TITLE :
Hydraulic Study of the Proposed Coastal Road from Teluk Chempedak to Beserah, Pahang, Malaysia
CLIENT :
Public Works Department (JKR), Malaysia
DURATION :
October 1994 - September 1995
PROJECT DESCRIPTION
A road linking Teluk Chempedak, a popular beach in Pahang and Beserah situated close to Kuantan, the state capital of Pahang was proposed to provide access to the public. The proposed road crosses the Beserah River several times. The MIKE11 modelling study determines the impacts of the road on the catchment hydrology and river hydrodynamics.

PROJECT TITLE :
Hydraulic Analysis of River Crossings for Gas Pipeline in Kluang, Johore, Malaysia
CLIENT :
MMC Engineering Sdn. Bhd.
DURATION :
October 1994 - February 1995
PROJECT DESCRIPTION
The client proposed the construction of a gas pipeline that crosses three rivers in Kluang. The study identified the 50- and 100-year flood levels to fulfill the Department of Irrigation and Drainage's requirements as well as obtaining the optimum pipe burying depth.

PROJECT TITLE :
Coastal Erosion/Accretion Studies for the Proposed Land Reclamation Works Along the Malacca Coast, Malacca, Malaysia
CLIENT :
Olympia Land Bhd.
DURATION :
December 1994 - February 1995
PROJECT DESCRIPTION
A 353 acres' land reclamation project fronting the Portuguese Settlement on the outskirts of Malacca City was proposed. The MIKE21 modelling work included assessment of the reclamation to the current pattern, sediment movement and nearshore wave activity.

PROJECT TITLE :
EIA for the Proposed Commercial & Housing Development of 130 Acres of Land at Sembulan Renewal Scheme, Phase 4 & 5, Sabah, Malaysia
CLIENT :
Skylark Jaya Sdn. Bhd.
DURATION :
March 1995 - October 1995
PROJECT DESCRIPTION
An EIA study was conducted to facilitate a land reclamation next to Tg. Aru, slightly south of Kota Kinabalu. A study into locating the source of fill material was also conducted around the reclamation site. The effects of reclamation and dredging (for fill material) onto the surrounding shoreline, including the newly developed Sutera Harbour reclamation adjacent to it, was modelled using MIKE21.

PROJECT TITLE :
Hydraulic Study for the Proposed D'Ambang Kota Resort Township at Mukim Jimah, District of Port Dickson, Negeri Sembilan, Malaysia
CLIENT :
True Creation Sdn. Bhd.
DURATION :
April 1995 - September 1995
PROJECT DESCRIPTION
As part of the proposed mixed development in Lukut, part of the Lukut River would be reclaimed with dredging carried out at certain locations around the river to construct waterfront housing. The river was modelled via MIKE11 and MIKE21 to ascertain the effects on river dynamics and sediment transport due to the proposed development.

PROJECT TITLE :
Hydraulic Study for the Proposed Sembilan Marine Resort Development, Negeri Sembilan, Malaysia
CLIENT :
Sembilan Marine Resort Sdn. Bhd.
DURATION :
April 1995 - February 1995
PROJECT DESCRIPTION
Located near the Linggi River estuary, the client proposed a mixed-type development (with a marina club) by reclaiming part of the existing mangrove swamp. MIKE21 was used to model the current patterns and nearshore wave activity.

PROJECT TITLE :
Hydraulic Study for the Proposed Riverfront Resort Tourist Development at Tg. Agas, Johore, Malaysia
CLIENT :
KEJORA & Mustika Sakti Sdn. Bhd.
DURATION :
May 1995 - September 1995
PROJECT DESCRIPTION
MIKE21 was utilised to assess the viability of initiating a resort development, centered around the Tg. Belungkor jetty (near the entrance of the Johore River) to cater for the influx of tourists from Singapore and Bintan, Indonesia, by reclaiming part of the mangrove swamps. Apart from current patterns, nearshore wave activity and sediment movement, a study of the prominence of streams and tributaries within the project area was also made.

PROJECT TITLE :
Hydraulic Study for a Mixed Development on Reclaimed Land of an Area 528 Acres in Umbai, Malacca, Malaysia
CLIENT :
KUB Development Bhd.
DURATION :
July 1995 - October 1995
PROJECT DESCRIPTION
Located fronting Pulau Besar in Malacca, the reclamation which includes a marina, is conceived to bring in tourists. MIKE21 was used to study the current pattern and nearshore wave activity before and after reclamation. Sediment movement during the reclamation process was also modelled.

PROJECT TITLE :
Consultancy Services for the Proposed Integrated National Primary School at Kuala Kangkong, Daerah Kota Setar, Kedah, Malaysia
CLIENT :
Kauthar Sdn. Bhd.
DURATION :
September 1995 - Present
PROJECT DESCRIPTION
The preparation of land survey and soil investigation specifications, design and related engineering works for the construction of an integrated primary school in Kedah.

PROJECT TITLE :
Hydraulic Study for Labuan Integrated Jetty Masterplan, Federal Territory of Labuan, Malaysia
CLIENT :
Pengurusan Lantas Sdn. Bhd.
DURATION :
October 1995 - March 1996
PROJECT DESCRIPTION
The client undertook a feasibility study of marine related works in Labuan. Using MIKE21, impacts (current pattern, wave penetration and siltation) of the proposed reclamation and breakwater installation were studied.

PROJECT TITLE :
Hydraulic Study for the Tioman Beach Improvement & Marina Works, Tioman Island, Pahang, Malaysia
CLIENT :
Berjaya Tioman Beach Resort Sdn. Bhd.
DURATION :
October 1995 - February 1995
PROJECT DESCRIPTION
Located on the southwestern part of Tioman Island, the Berjaya Tioman Beach Resort is currently facing acute shore retreat problems which is being remedied temporarily by beach nourishment. MIKE21 was used to study the best location to place offshore breakwaters and artificial breakwaters as well as studying the effects of providing river training breakwaters at the mouths of rivers/streams which have their outlets within the resort grounds. MIKE21 was also used to assess the placement of a breakwater system for a marina located immediately south of the existing resort.

PROJECT TITLE :
Hydraulic Study for Shipyard Activities at Teluk Gong, Mukim Kelang, Selangor, Malaysia
CLIENT :
Muhibbah Marine Engineering Sdn. Bhd.
DURATION :
November 1995 - Present
PROJECT DESCRIPTION
It is the intention of the client to provide shipyard facilities within the Kelang River (slightly south of South Port) near the bridge linking Teluk Gong and West Port. MIKE21 was used to study the current pattern as well as the sedimentation rate and sediment movement around the project area.

PROJECT TITLE :
Pekan Rompin Structure Plan Study, Pahang, Malaysia
CLIENT :
State Economic Planning Unit (UPEN), Pahang
DURATION :
February 1996 - Present
PROJECT DESCRIPTION
In order to map out future development strategies for the Pekan-Rompin district, a structure plan study was initiated. Among the issues raised was drainage and flood mitigation which includes assessment of the existing conditions, current related problems and erosion.

PROJECT TITLE :
Hydraulic Study & Soil Investigation Works for Sayak Beach & Country Resort Development in Mukim Kuala Muda, Kedah, Malaysia
CLIENT :
Sayak Beach & Country Resort Sdn. Bhd.
DURATION :
November 1995 - March 1996
PROJECT DESCRIPTION
MIKE21 was used to analyse the effects to the hydraulic regime of a proposed mixed-type development on approximately 5000 acres of reclaimed seafront land located near the Kedah-Penang border. Apart from modelling the sediment movement during reclamation works, sediment discharge of the Muda River and the placement of offshore discharge outlets were also modelled using MIKE21.

PROJECT TITLE :
langor Tourism Master Plan & Action Plan Study, Selangor, Malaysia
CLIENT :
Town & Country Planning Department (JPBD), Malaysia
DURATION :
November 1995 - May 1996
PROJECT DESCRIPTION
The study, which is multi-disciplinary and comprehensive, will address the future touristic development of Selangor. Among its objectives is the study of the drainage system and coastal area management system.

PROJECT TITLE :
lydraulic Study for the Proposed Resort Development on a Portion of Lot 305, Mukim Si Rusa, Port Dickson, Negeri Sembilan, Malaysia
CLIENT :
Fortune Valley Sdn. Bhd.
DURATION :
December 1995 - February 1996
PROJECT DESCRIPTION
The client proposed to develop a stretch of beach into a resort complex in Port Dickson, a popular tourist destination. Part of the resort would be in the form of chalets built on piles. A study was conducted to assess the effects of the piles' placement to the nearshore coastal processes utilising MIKE21 and LITPACK.

PROJECT TITLE :
Coastal & Marine Studies for the Development of Pulau Rebak Besar, Mukim Kedawang, Langkawi Island, Malaysia
CLIENT :
Rebak Island Marina Berhad
DURATION :
December 1995 - March 1996
PROJECT DESCRIPTION
Pulau Rebak Besar, an island located southwest of Langkawi, has been earmarked for tourism development. The island has one of the most sheltered marinas in Langkawi. It was necessary to conduct a marine resource inventory survey in the vicinity of the island's waters. A study into the coastal processes and sediment movement was made to ascertain the impacts of development. The study also included assessment of navigation and conditions within the completed marina basin. Locations for jetties on the island and on Langkawi were also selected based on wave activity and nearshore bathymetry.

PROJECT TITLE :
EIA for the Proposed 145 Acres Sembilan Marine Resort Mixed Development at Tg. Agas, Mukim Pasir Panjang, Port Dickson, Negeri Sembilan, Malaysia
CLIENT :
Sembilan Marine Resort Sdn. Bhd.
DURATION :
January 1996 - March 1996
PROJECT DESCRIPTION
An EIA study was conducted for the proposed mixed development on reclaimed mangrove swamps located next to the Linggi River estuary. Of particular concern was the water quality in the vicinity of the project area.

PROJECT TITLE :
Golok Rivermouth Improvement Project, Tumpat, Kelantan, Malaysia
CLIENT :
Department of Irrigation & Drainage, Malaysia
DURATION :
January 1996 - Present
PROJECT DESCRIPTION
The Malaysian government intends to proceed with the implementation of the project which includes the construction of a rubble mound breakwater, a rip-rap revetment and a river training groyne. The scope of consultancy services includes the preparation of final contract documents and all related aspects with regard to work supervision.

PROJECT TITLE :
Engineering Consultancy Services for Tg. Rhu Development, Langkawi Island, Kedah, Malaysia
CLIENT :
Kauthar Sdn. Bhd.
DURATION :
February 1996 - Present
PROJECT DESCRIPTION
Advising the client on the hydrologic and hydraulic behaviour of the Tg. Rhu area and the impacts of various proposed developments on the surroundings. Also, the design of various structures around Radisson Tg. Rhu, an exclusive suite hotel.

PROJECT TITLE :
Hydraulic Study for the Proposed Mixed Development at Sg. Terap, Batu Gajah, Perak, Malaysia
CLIENT :
Urban Development Authority (UDA), Malaysia
DURATION :
April 1996 - Present
PROJECT DESCRIPTION
The MIKE11 modelling of Johan River which flows through the development site (ex-tin mining land situated next to the Kinta River not far from Ipoh, state capital of Perak) to assess the flooding situation around the area.

PROJECT TITLE :
Hydraulic Study for the Proposed "Waterfront International Cities" Development at Mukim Sg. Petani, Sg. Panjang & Bujang District of Kuala Muda, Kedah, Malaysia
CLIENT :
Endah Maju Sdn. Bhd.
DURATION :
May 1996 - Present
PROJECT DESCRIPTION
The client wishes to develop 2805 acres of mangrove wetlands. MIKE11 modelling was carried out to ascertain the flooding situation before and after development. The functions of the mangrove wetland as a natural flood storage for Merbok River and Petani River would also be determined.

PROJECT TITLE :
Preparation of an Environmental Management Plan (EMP) for the Proposed Beris Dam Project, Kedah, Malaysia
CLIENT :
Department of Irrigation & Drainage, Malaysia
DURATION :
May 1996 - Present
PROJECT DESCRIPTION
The EMP (which covers various topics such as biology, public health, geotechnical engineering, etc.) includes the application of dam-break modelling, GIS and the establishment of a reservoir conservation and management plan.

PROJECT TITLE :
A Study into the Integrated Nature Programme Development at Tg. Rhu, Langkawi Island, Malaysia
CLIENT :
Kauthar Sdn. Bhd.
DURATION :
May 1996 - Present
PROJECT DESCRIPTION
The report will describe the important natural resources and features, their locations, conservation status, origins, uses, functions and other relevant information. The major topics which would be covered are the flora & fauna, coastal & marine resources and cultural & geological heritage.